Designed for
workflows

BuilderLab turns prompts into production-ready parts.It resolves geometry, cost, and supplier context.Then keeps every build decision traceable.

From prompt to form.

Resolve the part layer by layer, then carry the geometry into production.

Everything after the prompt stays visible.

bracket.step
Production-ready geometry with export history and constraint notes.
quote.pdf
Frozen supplier pricing with material, lead time, and fulfillment scope.
tolerance.txt
Critical dimensions stay visible through modeling and supplier handoff.
bom.csv
Part metadata, quantity, material, and process context in one bundle.
bracket.step
Production-ready geometry with export history and constraint notes.
quote.pdf
Frozen supplier pricing with material, lead time, and fulfillment scope.
tolerance.txt
Critical dimensions stay visible through modeling and supplier handoff.
bom.csv
Part metadata, quantity, material, and process context in one bundle.
bracket.step
Production-ready geometry with export history and constraint notes.
quote.pdf
Frozen supplier pricing with material, lead time, and fulfillment scope.
tolerance.txt
Critical dimensions stay visible through modeling and supplier handoff.
bom.csv
Part metadata, quantity, material, and process context in one bundle.
quote.pdf
Frozen supplier pricing with material, lead time, and fulfillment scope.
tolerance.txt
Critical dimensions stay visible through modeling and supplier handoff.
bom.csv
Part metadata, quantity, material, and process context in one bundle.
handoff.md
Plain-language production notes for the shop that receives the job.
quote.pdf
Frozen supplier pricing with material, lead time, and fulfillment scope.
tolerance.txt
Critical dimensions stay visible through modeling and supplier handoff.
bom.csv
Part metadata, quantity, material, and process context in one bundle.
handoff.md
Plain-language production notes for the shop that receives the job.
quote.pdf
Frozen supplier pricing with material, lead time, and fulfillment scope.
tolerance.txt
Critical dimensions stay visible through modeling and supplier handoff.
bom.csv
Part metadata, quantity, material, and process context in one bundle.
handoff.md
Plain-language production notes for the shop that receives the job.

Generated file set

Every part leaves the prompt with usable model files, tolerance notes, and production context.

Build activityLive

Geometry resolved

STEP and STL exports ready

08:42

Supplier matched

Three capable shops found

09:10

Quote frozen

Lead time and material locked

10:24

Payment cleared

Production handoff opened

11:05

Production alerts

Geometry, quote, payment, and fulfillment events stay visible as the build advances.

Part

Prompt

Match

CNC shop

3 days

Print farm

18 hrs

Sheet metal

5 days

Supplier routing

One manufacturable part can fan out to matching shops without losing requirements.

Production weekQuote held
MTWTFSS12345678910111213141516171819202122232425262728

Build planning

Freeze quote windows, payment timing, and production milestones in the same flow.

The handoff feels lighter.

MC

Maya Chen

@mayaalloy

BuilderLab turned a vague bracket request into a printable CAD model before our morning design review ended.

Product engineer, Alloy Works

JB

Jon Bell

@northlinejon

The supplier context is what changed the workflow. Geometry, pricing, and production notes arrive together.

Operations lead, Northline Fab

AR

Anika Rao

@fixtureanika

We use it to move from intake notes to manufacturable part candidates without losing the engineering trail.

Founder, Fixture Lab

Plans that grow with every part.

Free

For testing one idea before a part becomes real work.

$0/mo

No card required

Start free
  • 10 credits
  • Prompt-to-CAD generation for simple parts
  • Basic STL and STEP exports
  • Part history for recent builds
  • Standard queue priority

Plus

For regular builders moving from sketches to usable CAD.

$10/mo

Billed yearly

Get Plus
  • Everything in Free, and:
  • 200 credits
  • Longer build history
  • Higher file-retention limits
  • Priority model generation
Most popular

Pro

For teams preparing more parts for supplier review.

$20/mo

Billed yearly

Get Pro
  • Everything in Plus, and:
  • 500 credits
  • Supplier matching with frozen quotes
  • Checkout, payment, and production handoff
  • Advanced manufacturability notes

Max

For high-volume build loops and production-heavy teams.

$40/mo

Billed yearly

Get Max
  • Everything in Pro, and:
  • 1200 credits
  • Highest self-serve generation limits
  • Batch part exploration workflows
  • Production-ready export packages

Software pricing is separate from supplier quotes, material costs, shipping, and taxes. Production orders use the frozen quote generated at checkout.

Preparing workspace